Skip to content
DEFA Power

DEFA

Power

from NOK 8,591

Lowest price from 9 shops on Prisjakt, checked

See prices on Prisjakt
Max power (TN 400V, 3-phase)
22 kW
Max on 1 phase (TN and IT)
7.4 kW
3-phase on IT grid (230V)
Yes, max 12.7 kW
Max current
32 A
Cable
Fixed cable
Built-in DC fault protection (6 mA)
Yes
Manufacturer's datasheet

Supports 3-phase on IT grids. On a 230V IT grid you get up to 12.7 kW – but only if the car supports IT 3-phase too. Otherwise it's 1-phase and at most 7.4 kW. Read more about charging on an IT grid

In your home

How fast will it charge in your home?

The figures on this page assume a dedicated 32 A circuit. Choose your grid type and main fuse, and we'll work out what DEFA Power actually gives in your home.

Grid type
Supply

Where do I find this?
  • Grid type: If your fuse box says 230V between phases, you have an IT grid. 400V means a TN grid. Your grid company can also tell you.
  • Supply: Almost every home has a 3-phase supply. 1-phase is mostly found in cabins and some flats. If unsure, choose 3-phase.
  • Main fuse: It's on the main switch in the fuse box, often 40, 50 or 63 A. It's expensive to upgrade, so we use the one you have.
  • Charging circuit: If you already have a dedicated circuit for a charger, choose its fuse. Otherwise we estimate what the charger can use from the main fuse.
How we calculate with your fuses

About the DEFA Power

The DEFA Power has a 6-metre fixed charging cable and a screen that guides you through charging. It gives 22 kW on a TN grid and can be installed on an IT grid with 3 phases (12.7 kW at 32 A from its rated values).

It has a MID-certified meter, Wi-Fi, 4G and a network port, and supports OCPP 2.0.1, the newest version of the open control standard. An RCD isn't built in, so the circuit needs a type A RCD or a combined breaker (RCBO).

Good for

  • If you want a fixed cable and a screen
  • Billing or reimbursement: MID-certified meter
  • IT and TN grids

Worth knowing

  • Needs an RCD in the fuse box
  • Load balancing against the main fuse needs the DEFA Balancer accessory
  • The cable alone weighs 3.5 kg

Equipment and installation

From the manufacturer's datasheet. “Not stated” means the datasheet doesn't say, or it depends on the variant.

RCD (30 mA)
Separate, in the fuse box (type A)
MID-certified energy meter
Yes
Internet
Wi-Fi, 4G and network cable
OCPP (open control standard)
Yes, 2.0.1
Cable length
6 m
Water and impact protection
IP55, IK10
Operating temperature
-30 to 40 °C
Size (H × W × D)
350 × 167 × 113 mm
Source: manufacturer's datasheet

How fast do EVs charge with the DEFA Power?

Actual charging power for all 1128 car versions in our database, on a circuit that gives the charger its full power. The car almost always sets the limit.

IT grid · 230V

  • 11 kW · 3-phase75 cars
  • 7.4 kW · 1-phase986 cars
  • 7.2 kW · 1-phase15 cars
  • 7 kW · 1-phase18 cars
  • 6.6 kW · 1-phase22 cars
  • 4.6 kW or less12 cars

TN grid · 400V

  • 22 kW · 3-phase319 cars
  • 16 kW · 3-phase29 cars
  • 11 kW · 3-phase717 cars
  • 7.4 kW · 2-phase2 cars
  • 7.4 kW · 1-phase2 cars
  • 7.2 kW or less59 cars

Same charging speed, other chargers

These chargers give exactly the same charging speed as the DEFA Power with every car. The difference is price and equipment.

Charging speed with DEFA Power for popular EVs

Model Y Long Range AWD

Tesla · 2022–2025

TN 400V

11 kW

IT 230V · 3-phase

11 kW

Model 3 RWD

Tesla · 2021–2025

TN 400V

11 kW

IT 230V · 3-phase

11 kW

LEAF 40 kWh

Nissan · 2018–2024

TN 400V

7 kW

IT 230V · 1-phase

7 kW

ID.4 Pro 4MOTION

Volkswagen · from 2022

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

e-Golf

Volkswagen · 2017–2021

TN 400V

7.2 kW

IT 230V · 1-phase

7.2 kW

Enyaq 85x

Škoda · from 2023

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

e-tron 55 quattro

Audi · 2020–2022

TN 400V

22 kW

IT 230V · 1-phase

7.4 kW

EX40 Twin Motor

Volvo · 2024–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

bZ4X AWD

Toyota · 2022–2025

TN 400V

11 kW

IT 230V · 1-phase

6.6 kW

ID.7 Tourer Pro S

Volkswagen · 2024–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

ID.3 Pro

Volkswagen · 2024–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Q4 e-tron 45 quattro

Audi · 2023–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

2 Long Range Dual Motor

Polestar · 2021–2023

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

EX30 Single Motor ER

Volvo · 2023–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Kona Electric 64 kWh

Hyundai · 2019–2023

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

i3 120 Ah

BMW · 2018–2022

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

e-Niro 64 kWh

Kia · 2018–2020

TN 400V

7.2 kW

IT 230V · 1-phase

7.2 kW

Model S Long Range Plus

Tesla · 2020–2021

TN 400V

16 kW

IT 230V · 3-phase

11 kW

IONIQ 5 Long Range AWD

Hyundai · 2022–2024

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Mustang Mach-E ER AWD

Ford · 2022–2025

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Elroq 85

Škoda · from 2024

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

SEALION 7 82.5 kWh AWD Design

BYD · from 2024

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Ariya 87kWh

Nissan · 2022–2026

TN 400V

22 kW

IT 230V · 1-phase

7.4 kW

Model X Long Range Plus

Tesla · 2020–2021

TN 400V

16 kW

IT 230V · 3-phase

11 kW

Questions about the DEFA Power

Does the DEFA Power work on an IT grid?

Yes. The DEFA Power can charge on 3 phases on a 230V IT grid, at up to 12.7 kW. The car must support IT 3-phase too, and 75 of the 1128 car versions in our database do. The rest charge on 1 phase, at up to 7.4 kW.

How fast does the DEFA Power charge on a TN grid?

Up to 22 kW on 3 phases on a 400V TN grid. 319 of the 1128 car versions in our database can take the full power. The most common is 11 kW (717 cars), because the car's on-board charger sets the limit.

Does the DEFA Power need a separate RCD?

Yes. The DEFA Power has built-in DC fault protection (6 mA DC), but no RCD. The circuit needs a type A RCD in the fuse box, as well as the circuit breaker.

Does the DEFA Power have a MID-certified energy meter?

Yes. Its built-in meter is MID-certified, so the readings can be used when charging is billed or documented, for example in a housing co-op or for reimbursement from an employer.

How does the DEFA Power connect to the internet?

Through Wi-Fi, 4G and network cable. With built-in 4G the charger doesn't need Wi-Fi where it's mounted to get updates and be controlled from the app.

Does the DEFA Power have a fixed cable?

Yes, the DEFA Power has a fixed charging cable of 6 m. You park and plug in without fetching a cable.

Read more about charging on an IT grid and how we calculate the charging speed.

Charging speed with DEFA Power for every EV

IT grid (230V) first, then TN grid (400V). Tap a car for details.

Audi

Ford

Kia

Mercedes-Benz

Opel

Peugeot

Porsche

Tesla

Volkswagen

Volvo