Skip to content
Easee Charge Max

Easee

Charge Max

from NOK 11,199

Lowest price on Prisjakt, checked

See prices on Prisjakt
Max power (TN 400V, 3-phase)
22 kW
Max on 1 phase (TN and IT)
7.4 kW
3-phase on IT grid (230V)
Yes, max 12.7 kW
Max current
32 A
Cable
Type 2 socket – use your own charging cable
Built-in DC fault protection (6 mA)
Yes
Manufacturer's datasheet

Supports 3-phase on IT grids. On a 230V IT grid you get up to 12.7 kW – but only if the car supports IT 3-phase too. Otherwise it's 1-phase and at most 7.4 kW. Read more about charging on an IT grid

In your home

How fast will it charge in your home?

The figures on this page assume a dedicated 32 A circuit. Choose your grid type and main fuse, and we'll work out what Easee Charge Max actually gives in your home.

Grid type
Supply

Where do I find this?
  • Grid type: If your fuse box says 230V between phases, you have an IT grid. 400V means a TN grid. Your grid company can also tell you.
  • Supply: Almost every home has a 3-phase supply. 1-phase is mostly found in cabins and some flats. If unsure, choose 3-phase.
  • Main fuse: It's on the main switch in the fuse box, often 40, 50 or 63 A. It's expensive to upgrade, so we use the one you have.
  • Charging circuit: If you already have a dedicated circuit for a charger, choose its fuse. Otherwise we estimate what the charger can use from the main fuse.
How we calculate with your fuses

About the Easee Charge Max

The Easee Charge Max is a Charge Up with a MID-certified energy meter (class B, ±1 %). It replaces the earlier Easee Charge. Charging speed and the rest of the equipment are the same: 22 kW on a TN grid, 12.7 kW on 3 phases on an IT grid, a Type 2 socket and a built-in RCD.

The certified meter means its readings can be used when charging is billed or documented, for example for reimbursement from an employer.

Good for

  • If your charging is reimbursed or must be documented
  • IT and TN grids
  • A full fuse box: no separate RCD

Worth knowing

  • Doesn't charge faster than the Charge Up
  • Load balancing against the main fuse needs the Easee Equalizer accessory
  • You need your own Type 2 cable

Equipment and installation

From the manufacturer's datasheet. “Not stated” means the datasheet doesn't say, or it depends on the variant.

RCD (30 mA)
Built in
MID-certified energy meter
Yes
Internet
Wi-Fi and 4G
OCPP (open control standard)
Yes, 1.6J
Water and impact protection
IP54, IK10
Operating temperature
-30 to 40 °C
Size (H × W × D)
256 × 193 × 106 mm
Source: manufacturer's datasheet

How fast do EVs charge with the Easee Charge Max?

Actual charging power for all 1128 car versions in our database, on a circuit that gives the charger its full power. The car almost always sets the limit.

IT grid · 230V

  • 11 kW · 3-phase75 cars
  • 7.4 kW · 1-phase986 cars
  • 7.2 kW · 1-phase15 cars
  • 7 kW · 1-phase18 cars
  • 6.6 kW · 1-phase22 cars
  • 4.6 kW or less12 cars

TN grid · 400V

  • 22 kW · 3-phase319 cars
  • 16 kW · 3-phase29 cars
  • 11 kW · 3-phase717 cars
  • 7.4 kW · 2-phase2 cars
  • 7.4 kW · 1-phase2 cars
  • 7.2 kW or less59 cars

Same charging speed, other chargers

These chargers give exactly the same charging speed as the Easee Charge Max with every car. The difference is price and equipment.

Comparisons

Charging speed with Easee Charge Max for popular EVs

Model Y Long Range AWD

Tesla · 2022–2025

TN 400V

11 kW

IT 230V · 3-phase

11 kW

Model 3 RWD

Tesla · 2021–2025

TN 400V

11 kW

IT 230V · 3-phase

11 kW

LEAF 40 kWh

Nissan · 2018–2024

TN 400V

7 kW

IT 230V · 1-phase

7 kW

ID.4 Pro 4MOTION

Volkswagen · from 2022

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

e-Golf

Volkswagen · 2017–2021

TN 400V

7.2 kW

IT 230V · 1-phase

7.2 kW

Enyaq 85x

Škoda · from 2023

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

e-tron 55 quattro

Audi · 2020–2022

TN 400V

22 kW

IT 230V · 1-phase

7.4 kW

EX40 Twin Motor

Volvo · 2024–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

bZ4X AWD

Toyota · 2022–2025

TN 400V

11 kW

IT 230V · 1-phase

6.6 kW

ID.7 Tourer Pro S

Volkswagen · 2024–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

ID.3 Pro

Volkswagen · 2024–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Q4 e-tron 45 quattro

Audi · 2023–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

2 Long Range Dual Motor

Polestar · 2021–2023

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

EX30 Single Motor ER

Volvo · 2023–2026

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Kona Electric 64 kWh

Hyundai · 2019–2023

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

i3 120 Ah

BMW · 2018–2022

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

e-Niro 64 kWh

Kia · 2018–2020

TN 400V

7.2 kW

IT 230V · 1-phase

7.2 kW

Model S Long Range Plus

Tesla · 2020–2021

TN 400V

16 kW

IT 230V · 3-phase

11 kW

IONIQ 5 Long Range AWD

Hyundai · 2022–2024

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Mustang Mach-E ER AWD

Ford · 2022–2025

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Elroq 85

Škoda · from 2024

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

SEALION 7 82.5 kWh AWD Design

BYD · from 2024

TN 400V

11 kW

IT 230V · 1-phase

7.4 kW

Ariya 87kWh

Nissan · 2022–2026

TN 400V

22 kW

IT 230V · 1-phase

7.4 kW

Model X Long Range Plus

Tesla · 2020–2021

TN 400V

16 kW

IT 230V · 3-phase

11 kW

Questions about the Easee Charge Max

Does the Easee Charge Max work on an IT grid?

Yes. The Easee Charge Max can charge on 3 phases on a 230V IT grid, at up to 12.7 kW. The car must support IT 3-phase too, and 75 of the 1128 car versions in our database do. The rest charge on 1 phase, at up to 7.4 kW.

How fast does the Easee Charge Max charge on a TN grid?

Up to 22 kW on 3 phases on a 400V TN grid. 319 of the 1128 car versions in our database can take the full power. The most common is 11 kW (717 cars), because the car's on-board charger sets the limit.

Does the Easee Charge Max need a separate RCD?

Usually not. The Easee Charge Max has a built-in RCD and DC fault protection (6 mA DC), so the electrician only needs a circuit breaker for it in the fuse box. That saves space in the box. The electrician decides what your installation needs.

Does the Easee Charge Max have a MID-certified energy meter?

Yes. Its built-in meter is MID-certified, so the readings can be used when charging is billed or documented, for example in a housing co-op or for reimbursement from an employer.

How does the Easee Charge Max connect to the internet?

Through Wi-Fi and 4G. With built-in 4G the charger doesn't need Wi-Fi where it's mounted to get updates and be controlled from the app.

Does the Easee Charge Max have a fixed cable?

No. The Easee Charge Max has a Type 2 socket, so you need your own Type 2 charging cable. Choose one rated for 32 A and 3 phases to get full speed with a future car too.

Read more about charging on an IT grid and how we calculate the charging speed.

Charging speed with Easee Charge Max for every EV

IT grid (230V) first, then TN grid (400V). Tap a car for details.

Audi

Ford

Kia

Mercedes-Benz

Opel

Peugeot

Porsche

Tesla

Volkswagen

Volvo