Charging in housing co-ops and condominiums
If you live in a Norwegian housing co-op (borettslag) or condominium (sameie), you usually have the right to charge your EV where you park. Here is what the law says, how shared charging systems work, and what you and the board should agree on.
What the law says
Since 1 January 2021 the right to charge has been in the Housing Cooperatives Act § 5-11 a and the Condominiums Act § 25 a (both in Norwegian). The rules are the same:
- With your own parking space: you have the right to set up a charging point at the space, with the board's consent. Consent can only be refused if there is a reasonable ground.
- Without your own space, but with the right to park: you can demand that a charging point is set up. The board must do so unless it has a reasonable ground to refuse, and the board decides where the charging point goes.
The law doesn't say exactly what a reasonable ground is. Examples could be that the power capacity isn't enough, or that the co-op is working on a shared solution for everyone. If the answer is no, ask for the reason in writing.
Your own charger or a shared system?
- Your own charger: you have a charger installed at your space, often at your own cost. This works when few people charge, but the power usually comes from the shared supply, so the co-op needs a way to bill for it.
- Shared charging system: the co-op installs cabling and load balancing for the whole car park, and residents connect chargers over time. Power is shared between the cars, and use is metered per charger. This scales best as more people get EVs.
- Charging operator: a supplier builds and runs the system, and each resident pays a subscription plus the power they use. The co-op avoids running it, but is tied to the supplier. Read the contract carefully.
Capacity and load balancing
The whole building shares one power supply. If many cars charge at once without control, it can overload the installation. Load balancing shares the spare capacity between the chargers, and turns down when the rest of the building uses a lot. Each car charges a little slower when many charge at once, but overnight most get enough. Read more about main fuses and load balancing.
Have an electrician survey the capacity before you choose a solution. It decides how many chargers the installation can take, and whether the supply needs upgrading.
Chargers for shared parking, and IT grids
Many older housing co-ops have a 230V IT grid. The same rules apply as in a house: 3-phase charging needs both the car and the charger to support IT 3-phase, otherwise it's 1 phase and at most 7.4 kW. See which home charger to choose for an IT grid.
| Charger for shared parking | Price | IT 230V |
|---|---|---|
| Easee Charge Core | from NOK 9,479 | 12.7 kW3 phases |
| Zaptec Pro | from NOK 12,265 | 12.7 kW3 phases |
Price per charger from Prisjakt. A shared system also costs cabling, load balancing and installation.
Paying for the power
If you charge from the shared supply, the power must be split fairly. Usually each charger meters its use, and the resident pays for it through the common costs, an app or a charging operator. Ask whether the charger's meter is approved for billing, and agree which electricity price to use.
What to do as a resident
- Ask the board in writing, and ask whether a shared system is planned.
- Find out which grid the building has, and whether you have your own space or only the right to park.
- Choose a charger that suits your car and the grid, ideally one that can join a shared system later.
- Agree in writing who pays for the installation, how power is billed, who maintains the charger, and what happens to it when you move.
- Use a registered electrical contractor. See installing a home charger.
Checklist for the board
- Map the need: how many have an EV now, and how many expect to in the next few years?
- Have an electrician assess the capacity of the power supply and the distribution in the car park.
- Choose a model: individual chargers, a shared system or a charging operator.
- Get quotes on the same basis, with load balancing and metering for billing.
- Decide how the investment and the power are split. Large investments may need a vote at the general meeting (generalforsamling or årsmøte). Check the statutes.